HOME    PORTFOLIO    FACTORIES    CERTIFICATES    ABOUT US    CONTACT
 Home   >   Portfolio   >   Completed works   >   Greenfield construction   >   Production hall RUD – Sibiu   

Production hall RUD Florian Rieger SRL step II - Sibiu

 
BeneficiaryS.C. RUD Florian Rieger S.R.L.
Execution time:4 months
Built area: 15,000 sqm
Work description: increasing the production area of the company RUD Florian Rieger Ltd with 3,600 sqm by construction of two new industrial modules. The infrastructure is made of insulated rigid foundations under metal pillars and foundation beams made under the closing walls socket. The strength steel structure consists of transverse frames with pillars embedded in the foundations and the drains are imbedded by the pillars. The building envelope of the roof is made of metal sheet + wool + board, perimeter enclosures consist of structural cassettes + wool + board.

UNIMAT

distributor of building materials in the group CON-A
www.unimat.ro

CON-A fondation

involved in the community!
www.fundatiacona.ro
© 2019. All rights reserved.