Production Hall - Thimm Packaging - Şura Mică, Sibiu County

 
Beneficiary:Thimm Packaging
Execution time:8 months
Total building area:18,500 sqm
Work description: In this project CON-A executed the works for the extension of the administrative and production spaces. The production hall for cardboard packaging has a surface of 17 000 sqm and will encompass a production area, mechanic and repair workshop, technical spaces. The constructive system is made of main prestressed concrete frames and prestressed concrete, corrugated metal sheet for the roof, Rockwool insulation, Sika foil waterproofing, rain water system type GEBERIT. Interior and exterior finishing works were also executes, as well as the installations. The modifications and the extension of the administrative space have approximately 1 200 sqm and include spaces for the staff, toilets, lunch rooms. The extension of the administrative building is made of bearing masonry, reinforced concrete foundations and floor, having the facade plated with corrugated metal sheet, the roof is a no traffic terrace thermally insulated with mineral wool and waterproofing Sika membrane, the annexes were built with metal frames and cassette panels. The exterior landscaping includes the executions of a parking, platform and sidewalks, green areas.

UNIMAT

distributor of building materials in the group CON-A
www.unimat.ro

CON-A fondation

involved in the community!
www.fundatiacona.ro
© 2019. All rights reserved.