HOME    PORTFOLIO    FACTORIES    CERTIFICATES    ABOUT US    CONTACT
 Home   >   Portfolio   >   Completed works   >   Greenfield construction   >   Warehouse - Avrig   

Warehouse - Avrig

 
Beneficiary:S.C. Europlant S.R.L.
Execution time:9 months
Developed surface:808.06 sqm
Work description:The existing warehouse (entirely built by CON-A) was extended with storage buildings for potatoes preservation and other related areas (technical, storage areas, and toilets). The building is an industrial hall, it has a metal frame structure with insulated concrete foundations and concrete foundation beams. The closure of the building was performed with precast panels made of board with polyurethane foam, sandwich type, for wall and cover.

UNIMAT

distributor of building materials in the group CON-A
www.unimat.ro

CON-A fondation

involved in the community!
www.fundatiacona.ro
© 2019. All rights reserved.