Infrastructure Projects

Tureni Expressway
The express road has a length of 5 km, including 9 bridges and viaducts, built by our company. The longest of these measures 256 meters and is a viaduct with 6 spans, with a platform length of 246 meters.

The bridge over the Olt River at Voila
The project involves the construction of a bridge over the Olt River with a single span of 76 meters.

Bike Lane in Sibiu
The cyclist path along the Cibin river is realized on a route consisting of six distinct segments, totaling a length of 3,674 meters.

Rehabilitation and Modernization of the Access Road to Păltiniș Resort
The rehabilitated road establishes a connection between County Road 106A and the chairlift area at the base of the Oncești slope.

Modernization of County Road 106 Sibiu – Cornățel – Altana – Bârghiș – Agnita
As part of the modernization project for County Road 106 Sibiu – Cornățel – Altana – Bârghiș – Agnita, CONA constructed the 7 bridges and culverts included in the contract.