Tureni Expressway

Surface

5 km in lenght

Location

Cluj County

Client

CNAIR, through DRDP Cluj

Completion

July 2025

Role in the project

Specialty Contractor

The express road has a length of 5 km, including 9 bridges and viaducts, built by our company. The longest of these measures 256 meters and is a viaduct with 6 spans, with a platform length of 246 meters.

The road profile consists of an expressway with lane widths of 3.5 meters and a 3-meter-wide central median, where lane separators are installed. An additional 10 kilometers are added through the ramps at the interchanges with the A3 and DN1, with each ramp having two lanes.